Whenuapai Development
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2022-121
Cabra Developments Limited
To subdivide four separate sites in Whenuapai, Auckland covering a total of approximately 13.7 hectares, and construct a residential development on three of the sites. The project includes:
15 Clarks Lane (Site A), 10 Sinton Road (Site B) and 16 Sinton Road (Site C), and a light industrial development on the fourth site at 90 Trig Road (Site D).
Schedule 103 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1.4 MB]