Wairatahi Project
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2022-111
The Property Group
To subdivide approximately 28.2 hectares of land and construct a comprehensive urban development on that land. The project includes two development options. Option A will provide approximately 450 residential units (or approximately 523 if a retirement village is constructed) and Option B will provide approximately 425 residential units (or approximately 475 if a retirement village is constructed).
The Project will occur at 238 Stock Road and 49A Dundee Drive, Flaxmere, Hastings.
Schedule 67 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1 MB]