Te Rere Hau Wind Farm Aokautere Extension
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2023-163
NZ Windfarms Limited
To develop and expand the existing Te Rere Hau Wind Farm by: installing up to nine three-bladed turbines up to 162 metres high, at Forest Hill Road (to the north of the existing wind farm); decommissioning eight existing turbines; upgrading and widening 10.5 kilometres of internal access roads; upgrading existing public roads and installing new ancillary infrastructure and structures including transmission lines.
Various locations 18 kilometres north-east of Rotorua and 2 kilometres north-east of Okere Village above the Taheke geothermal field.
Schedule 91 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1.2 MB]