Ōpunake Solar Farm
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2023-138
Energy Farm Limited
To construct and operate a solar farm on an approximately 188-hectare site and to connect to and supply electricity to the national grid via existing 33kV Powerco Limited transmission lines. The solar farm will have an output of approximately 80-110 peak megawatts peak and comprise:
574 and 575 Upper Kina Road, Ōpunake, Taranaki.
Schedule 101 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 825 KB]