Man Street Hotel - Queenstown
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2022-125
The Queenstown Hotel (NZ) Limited Partnership
To construct and operate a hotel up to 6 storeys (20.6 metres) high above an existing 2-storey basement car parking building, and to construct a loading zone in the adjacent road reserve. The hotel will include 175–185 guest rooms, ancillary uses (some of which will be located in the existing carpark building), and connections to existing infrastructure.
12–26 Man Street, Queenstown.
Referred projects order: Schedule 73 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1.3 MB]