Kings Quarry
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2023-148
Kings Quarry Limited
To expand the existing Kings Quarry operation and will include the extraction of approximately 500,000 tonnes of aggregate per year for a period of 60 years, stockpiling and processing aggregate on site, constructing a vehicle access point at the intersection with Pebble Brook Road, internal vehicle access and haul roads, and infrastructure and structures associated with quarry operations and reclaiming permanent and intermittent watercourses and undertaking ecological enhancement.
Pebble Brook Road, Wainui, Auckland.
Referred projects order: Schedule 84 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1.1 MB]