Hobsonville Road Retirement Village
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2023-156
Kings Heights Group Limited
To construct and operate a retirement village on a 4-hectare site. he retirement village will include approximately 354 residential units, including approximately 42 single storey villas, approximately 267 independent-living apartments in six buildings between four and six storeys in height (excluding basement car parking levels), and 45 care units in one building of three storeys in height (excluding basement car parking levels). The retirement village also includes an amenities building of two storeys in height and one basement level, containing a reception, health and well-being facilities, a pool and café.
The project includes works within the Hobsonville Road road reserve to upgrade the site access and within the Hobsonville Road and Westpoint Drive road reserves to construct infrastructure. The project also includes the development of outdoor recreation areas, landscaping and planting, car parking areas, and construction of accessways and three-waters services infrastructure.
82 Hobsonville Road, West Harbour, Auckland.
Schedule 106 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1.3 MB]