Glenpanel, Ladies Mile - Te Pūtahi

This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).

Project ID

2022-090

Applicant

Maryhill Limited

Project summary

To subdivide land and:

  • Construct approximately—
  • 640 to 748 residential units if a school or a retirement village are not constructed; or
  • 522 to 630 residential units if a school (including a church or childcare centre) is constructed; or
  • 422 to 530 residential units if a retirement village is constructed that includes—
    • 152 retirement villas; and
    • 62 care and dementia units
  • construct and operate commercial buildings
  • develop land for the purpose of open space that comprises private open space and public reserves
  • construct infrastructure or structures that are associated with the residential development.

Location

429 Frankton-Ladies Mile Highway.

Referred projects order

Reasons for decision

The project will:

  • help to achieve the purpose of the Act
  • have positive effects on social well-being by generating employment and providing additional housing of a range of types in an area with a housing shortage
  • generate approximately 313 direct full-time equivalent jobs (FTE jobs) per year over a 7-year construction period, and 77 ongoing FTE jobs if a retirement village is constructed
  • increase housing supply through the construction of approximately 640 to 748 residential units (or approximately 118 fewer residential units if a school and a childcare centre or church are also constructed)
  • likely progress faster than would otherwise be the case under standard Resource Management Act 1991 consenting processes.

Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.

Section 17 report

Section 17 report [PDF, 1.6 MB]

Proactive release of application and decision documents