Clutha Upper Waitaki lines project – project works and workers’ village
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2020-009
Transpower New Zealand Limited
To upgrade existing electricity transmission lines and associated works; and construct and use land for a temporary workers’ village.
In a loop from Roxburgh north to Naseby, Livingstone, the Waitaki (including dams at Aviemore, Benmore, Ohau B and C) and Twizel, and south through Cromwell and Clyde to Roxburgh. The proposed temporary workers’ village located near Ranfurly.
Schedule 2 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
This project has been accepted.
The project:
Section 17 report [PDF, 230 KB]