Arawhata Wetland Project
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2023-150
Manawatu-Wanganui Regional Council
To construct, operate and maintain a wetland complex across 119 hectares in the Arawhata Stream catchment to enhance water quality, ecology and cultural values.
269 and 308 Hokio Beach Road, 217 Arawhata Road, Levin and adjacent land (legally described as Section 4 Survey Office Plan 465440). The project will include works within the Hokio Beach Road and Arawhata Road reserves.
Schedule 92 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project will:
Any actual and potential effects on the environment, and proposed measures to avoid, remedy, mitigate, offset, or compensate for any adverse effects, can be appropriately tested by an expert consenting panel against Part 2 of the Resource Management Act 1991 and the purpose of the Act.
Section 17 report [PDF, 1.1 MB]