Neutral

Issue Interference with other Infrastructure

Camperdown Holdings Ltd

Summary of Reason

Camperdown own a large area of land through which the underground cable is planned to pass. Discussions with Transpower have taken place and should continue, there are a number of agreed protocols that have been discussed in respect to activities on the site by either Camperdown or Transpower.

Ref# 0842

Neutral

Wishes to be Heard

Summary of Decision Sought

Uphold Requirement and consents. Include matters listed in any conditions to provide for coverage of the matters discussed and agreed between Camperdown and Transpower.

Zone

General

 

Transit NZ

Summary of Reason

Transit manages and owns a number of land resources and roads, some of which will be crossed by the proposed lines. Adverse effects on road users, roading and land holdings need to be managed, ongoing discussions between Transit and Transpower should continue to work towards agreement on any handling of these adverse effects.

Ref# 1004

Neutral

Wishes to be Heard

Summary of Decision Sought

Uphold Requirement and consents

Zone

General

Add conditions (listed)

Oppose

Watercare Services

Summary of Reason

Effects on existing infrastructure

Drinking water

Waste water

Ref# 0800

Oppose

Wishes to be Heard

Summary of Decision Sought

Decline

Zone

General

Conditions requirement

King

Summary of Reason

Type B plus especially opposed to underground line through residential properties

Ref#0833

Oppose

Wishes to be Heard

Summary of Decision Sought

Type B

Zone

Manukau City Council

 

McKenzie C

Summary of Reason

Transpower procedures, lack of transparency

Ref# 0855

Oppose

Wishes to be Heard

Summary of Decision Sought

Bury cable Hunua to Otahuhu

Zone

Manukau City Council

 

Vector Ltd

Summary of Reason

Existing infrastructure already exist along the proposed route, Experience has shown that Transpower’s transmission corridors are quite expansive, this could preclude Vector from accessing its plant and installing new plant

Ref# 0863

Oppose

Wishes to be Heard

Summary of Decision Sought

If granted include reasonable conditions to cover matters listed

Zone

General

 

Issue

Access restrictions

Support

Housing new Zealand Corporation

Summary of Reason

Accepts the need to provide electricity and particularly prefers underground to overhead in the community. Adverse effects such as social disruption, construction, hazard exposure and effects on the health, well being and quality of life will be no more than minor.

Ref# 1047

Support

Wishes to be Heard

Summary of Decision Sought

Uphold Requirement and consents (With conditions suggested). Actual and Potential effects associated with construction of the project be clarified and confirmed in respect to HNZC properties.

Zone

General

 

See more on...