P

Table A1: Summary of NES activities


Activity

C

RD

D

NC

All transmission activities that meet specified terms and conditions, set out below according to the type of activity they apply to. tick        
Addition or replacement of overhead conductors (up to duplex, up to 50 mm or existing diameter). tick        
Addition or replacement of overhead circuits, conductors or earth wires, and cables in excess of the number or size specified for permitted activities.     tick    
Addition or replacement of overhead earth wires and aerial communications cables, including earth wires containing optic fibres (up to 3 wires or existing number, up to 25 mm or existing diameter). tick        
Addition or replacement of overhead circuits, conductors or earth wires, and cables in excess of the number or size specified for permitted activities.     tick    
Adding circuits (where support structure was designed and built to carry an extra circuit). tick        
Adding circuits to other lines.     tick    
Increasing the voltage or current rating of a line and adding conductors and circuits where ICNIRP guidelines for EMF are met. tick        
Activity resulting in generation of EMF (if it fails the terms and conditions for a permitted activity).         tick
Replacing, moving and upgrading of support structures and foundations (max. height increase 15%, max. footprint increase 25%, pole not replaced with a tower, no relocation outside relocation envelopes). tick        
Replacing, moving and upgrading support structures and foundations, exceeding permitted thresholds but meeting controlled activity thresholds.   tick      
Replacement or alteration of a pole or tower that does not meet the thresholds as a permitted or controlled activity.     tick    
Removal of transmission support structures, conductors and associated foundations (site clean-up and rehabilitation). tick        
Removal of transmission support structures, conductors and associated foundations failing permitted terms and conditions.     tick    
Application of surface coatings (no noxious discharge). tick        
Application of surface coatings failing the terms and conditions for a permitted activity.   tick      
Wet, dry and non-abrasive blasting (not within 50 m of water body or public road or 100 m within occupied building; no chemicals; collect waste; no discharge). tick        
Wet, dry and non-abrasive blasting not complying with permitted but not undertaken over water in coastal marine area, not within 100 m of an occupied building or over a road and application of surface coatings not complying with permitted activity.   tick      
Wet, dry and non-abrasive blasting over coastal marine area water and within 100 m of an occupied building.     tick    
Temporary structures and temporary line deviation. tick        
Temporary structures exceeding time constraints.   tick      
Signs attached to transmission infrastructure (size, purpose). tick        
Signs above the size limit.     tick    
Trimming or removal of trees or vegetation for transmission line maintenance and ongoing operation (not protected individually or as a part of scheduled areas; not part of river and erosion control management schemes; not within DoC land). tick        
Trimming or removal of generally protected trees/vegetation (not individually scheduled trees).   tick      
Trimming or removal of individually protected trees for the purpose of reducing risk to transmission lines which do not comply with the terms and conditions for a permitted activity.     tick    
Earthworks, including tracking, associated with transmission activities (volume and area limit; no more than 50 m3 per tower or pole or 100 m3 per track in scheduled areas; soil erosion protection; remediation; no contribution to instability or erosion; prevent debris from entering water body or coastal marine area; no earthworks in coastal marine area or beds of lakes and rivers; no works in archaeological areas, wāhi tapu or other scheduled areas). tick        
Earthworks that do not meet permitted activity conditions, but excluding earthworks in scheduled landscape, or ecological or heritage areas of cultural significance.   tick      
New access tracks to transmission lines not in scheduled landscape, or ecological area or areas of cultural significance.   tick      
Earthworks associated with works or involving access to a line in scheduled landscape, or ecological or heritage areas of cultural significance.     tick    
New access tracks resulting in loss or removal of trees or vegetation protected in a plan or land that is part of a protected natural feature, archaeological site or site of significance to Māori.       tick  
Construction noise and vibration associated with transmission activities (including implosive jointing, noise complies with NZS 6803:1999, vibration complies with DIN 4150-3:1999). tick        
Noise that fails to meet permitted activity standards, terms and conditions.   tick      
Installation of antenna dishes on transmission line support structures. tick        
Telecommunication facilities on existing transmission line support structures which do not meet the terms and conditions for permitted activity.     tick    
Transmission activities over surface water or over the coastal marine area (no activities at ground level). tick        
Discharges of water and contaminants from transmission activities. tick        
Discharges to water and the coastal marine area that fail to meet permitted activity standards, terms and conditions.   tick      
Undergrounding of existing transmission lines, including termination towers, that meet the permitted activity standards for increasing the voltage and current rating.   tick      
Any transmission activity that does not meet the terms and conditions for permitted activity and is not listed as permitted, controlled, restricted discretionary or discretionary.         tick

Note: EMF = electromagnetic fields; ICNIRP = International Commission on Non-Ionising Radiation Protection; DoC = Department of Conservation; NZS = New Zealand Standard; DIN = the German Institute for Standardization (Deutsches Institut für Normung e.V.)

P – permitted activity, C – controlled activity, RD – restricted discretionary activity,
D – discretionary activity, NC – non-complying activity

 


See more on...