Submitted in accordance with clause 4(4) of the Resource Management (National Environmental Standards for Telecommunication Facilities) Regulations 2008.
Notice of new telecommunication facility generating radiofrequency fields
Location of telecommunication facility
Address: | |
Facility on road reserve? | ![]() ![]() |
Grid reference: | |
Physical structure consent requirements |
|
Estimated date of starting operation: |
Network operator details
Operator name: | |||
Contact person: | |||
Address: | |||
Phone/fax: | Email: |
Compliance checklist
Yes | No | |
Design and operation | ||
Facility planned and operated in accordance with NZS 2772.1: 1999, including compliance with clause 10(d)? [cl 4(3) of NES] | ||
Predicted exposure levels report | ||
Is report on predicted exposure levels attached? [cl 4(4)(b) of NES] | ||
Report prepared in accordance with NZS 6609.2. 1990? [cl 4(4)(b)(i) of NES] | ||
Other transmitters nearby taken into account? [cl 4(4)(b)(ii) of NES] | ||
Exposures in publicly accessible areas exceed 25% of public limits (post-installation measurements required)? [cl 4(5)5 of NES] | ||
Will exposures in publicly accessible areas exceed public limits specified in NZS 2772.1. 1999?8 (If yes, then facility will be non-complying) |
Supporting documentation attached (tick all applicable)
Location plan: | |
Site plan: | |
Elevation drawing: | |
Technical specifications: | |
Others: |
Other information
(Note: if a certificate of compliance is required, check the specific information requirements of the relevant local authority.)
Name of person responsible for this report: | |
Qualification/experience: | |
Signature of person responsible for this report: |
8. If the answer is YES, then resource consent will be required before the facility can be installed.
See more on...
Appendix C: Radiofrequency Reporting Template
November 2009
© Ministry for the Environment