Eastern Porirua regeneration project – infrastructure works
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
This project has been referred to an expert consenting panel for fast-track consenting under the Covid-19 Recovery (Fast-track Consenting Act 2020).
2020-021
Kāinga Ora – Homes and Communities and Porirua City Council
The project consists of:
Multiple locations in Eastern Porirua, Porirua
Schedule 9 to the COVID-19 Recovery (Fast-track Consenting) Referred Projects Order 2020 [New Zealand Legislation website]
The project:
Any adverse effects arising from the application (and proposed mitigation measures) can be tested through the expert consenting panel having regard to Part 2 of the RMA and the purpose of the Act.
Section 17 report [PDF, 805 KB]